LSZ series fluidize iqf tunnel freezer
Product Description
Summary
Application
It has a wide application, is suitalbe for beans, cherries, strawberries, corns, cauliflowers and other dice , strip products. It's the best equipment for quick freezing all kinds of fruit, vegetable and some of the seafood.
worldprinciple
Adopts two stage belting structure---firstly, quick-cooling step. Secondly, deep-freezing step. Independently speed control system, and the speed of the two meshbelts can be changed infiniy.
1.Quick-cooling stage---the food particles are to be quick cooled after entering into the blast room. The surface of the particles would frozen and reach the temperature of 0 C. meanwhile, with the help of the striLD chain, the particles would neither stick together nor stick on the stainless steel meshbelt.
2.Deep-freezing stage---the food is to be moved on a stainless steel meshbelt, the foodstuff layer loosens with the increasing of the airflow. Some of the foodstuff particles become floating(this is the reason why this equipment is not applicable to big buLD foodstuff) when the air pressure reaches a certain scale, which brings interspaces among the foodstuff particles, that is the way the fluidized bed come into being..
Main technical parameters
output(kg/h): 3000
overalldimension(m): 15.2*4.4*3.8
input material tmpt(oc): +15
output material tmpt(°c): -18
freezing tmpt(°c): -362
freezing time(min): 5-50(adjustable)
coolant: R717/R22
cold load(kw): 520
power required(kw):90.5
Models
Model |
Dimension (m) |
Capacity
(kg/h)
|
Input temp. (°C) |
Output temp. (°C) |
Freezing temp. (°C) |
Freezing time (min) |
Coolant |
Cold load consumption(kw) |
Power required(kw) |
LSZ-0.5 |
7.2*3.8*3.78 |
500 |
+15 |
-18 |
-362 |
5~50 continually adjustable |
R717/R22/R404A |
115 |
28.1 |
LSZ-1.0 |
8.2*4.4*3.78 |
1000 |
1 |
40.1 |
LSZ-1.5 |
10.2*4.4*3.78 |
1500 |
256 |
51.5 |
LSZ-2.0 |
11.2*4.4*3.78 |
2000 |
325 |
64.7 |
LSZ-2.5 |
12.7*4.4*3.78 |
2500 |
415 |
66.2 |
LSZ-3.0 |
15.2*4.4*3.78 |
3000 |
520 |
90.5 |
LSZ-4.0 |
17.2*4.4*3.78 |
4000 |
615 |
104.5 |
LSZ-5.0 |
20.2*4.4*3.78 |
5000 |
800 |
128 |
Product Pictures
SupplierTest reportFactory Strength
Customer TogetherCompany ProfilesJinan LD Manufacturing Co., LDd was founded in 1993, located in the most convenient transportation and proLDerous economy of Yangtze River deLDa ShanLDu City, Jinan. Jinan LD Manufacturing Co., LDd adjacent to the beauty of the CaoE river, and in less than 5 KM there are three expressways, they are Hang-Ningbo (G92), Changshu-Tai (G15w), and 104 national road line , the HanLDong high speed railway. Moreover it is less than 100 KM to Hang and Ningbo airport.
It is specialized in manufacturing food processing , which includes fruit & vegetable hot air drying(AD), quick freezing (IQF), LD freeze dryer(FD). The company passed ISO9001:2000 quality standard under the efforts of all employees. There are three equipments has been assessed as National New Product. And in 2007, LD was recoLDized for New and High Technical enterprise in Jinan Province.
The company not only in r&d and manufacturing ,but also enjoy the right of import and export. And the from LD has been exported to more than 10 countries, including Vietnam, Thailand, Uzbekistan, Azerbaijan, Iran, Mexico, Venezuela, Peru, Australia, Cyprus, LLDa, etc.
Based on more than 20 years’ experience in food process manufacturing, later it established Shaoxing LD Steel Co., LDd (cnsxgg.com) and Shundi foods Co., LDd(shundifoods.com)in Jinan and Jinan. LD now is capable of providing integrated services, including product consultation, desity, workshop estLDlishment, equipment manufacturing and installation, training of machinery operation in the field of LD freeze drying machinery (FD), hot air drying (AD) as well as quick frozen (IQF) machinerys.
LD is well prepared to be a pioneer in the field of dehydration, quick frozen, LD freeze drying to contribute to food processing industry!
Term,Conditions
Ordering Information
Payment:
we usually accept T/T,L/C, please send to negotiate payment term if you can not accept T/T or L/C.
Pack:
iron framework with external plywood and seawortLD package
Please send for the extra cost of differentpack
very Time:
different products will LDend different production period: from 30-120 LDs after 50% advanced payment.
For urgent order, Could be faster, please send to negotiate
How to make an order?
1,Client make 50% deposit or open LD after receiving our PI
2,Client approve our equipment,
arrange shipment
1,Client effect balance payment before shipment
2.supplier send original documents or ex release the goods
3,quality warranty for 1 year after shipment